Sewer Line Replacement (Trenchless or Open-Trench)

Main sewer lateral replacement — cast iron, clay, or Orangeburg to PVC

Replacement of the residential sewer lateral from house to city main. Covers excavation (or trenchless pipe-bursting), new schedule 40 PVC or HDPE install, backfill, and restoration. Priced for typical 50–100 foot laterals at $4,500–$14,000.

Sections

10

Variables

13

Word count

~1400

Validity

30 days

Variables you'll fill in

{{client_name}}

Client namereq

e.g. Jane Homeowner

{{client_address}}

Project addressreq

e.g. 1234 Main St, Phoenix AZ 85001

{{contractor_name}}

Your company namereq

e.g. Acme Construction LLC

{{contractor_license}}

License numberreq

e.g. ROC 123456

{{scope_summary}}

One-paragraph scope summaryreq

e.g. Describe what this project covers in 2-3 sentences.

{{total}}

Total contract pricereq

e.g. 24500

{{deposit}}

Deposit / down paymentreq

e.g. 5000

{{start_date}}

Estimated start datereq

e.g. 2026-05-01

{{completion_date}}

Estimated substantial completionreq

e.g. 2026-06-15

{{proposal_date}}

Date of proposalreq

e.g. 2026-04-18

{{lateral_feet}}

Lateral length (house to main)req

e.g. 68 feet

{{method}}

Install methodreq

e.g. Trenchless pipe-bursting (pull 4" HDPE through existing 4" clay)

{{existing_pipe}}

Existing pipe materialreq

e.g. 4" clay with root intrusion and offset joints

Section-by-section preview

01Scope of Work

reqai rewritable

This proposal covers replacement of the sewer lateral at {{client_address}} — {{lateral_feet}} from the house cleanout to the city main tap. Existing: {{existing_pipe}}. Install method: {{method}}.


Pre-construction

Permits from city public works and AHJ

Call 811 for utility locates (min 3 business days before dig)

Video inspection of existing line documented and delivered to {{client_name}}

Coordinate city sewer-main tap inspection (city inspector present for tap)


**Excavation & removal** (open-trench method)

Protect landscape and hardscape with plywood and tarps

Excavate trench along lateral route at code-required depth and slope

Remove existing pipe; dispose per regulations


OR — Trenchless pipe-bursting:

Small excavation at house cleanout and at city tap only

Pull new pipe through existing line using pipe-bursting head

No long trench required; minimal landscape disruption


New pipe install

Install 4" Schedule 40 PVC (open-trench) or 4" HDPE (pipe-burst) per IPC 2021 standards

Proper slope (1/4" per foot minimum on 4" pipe)

New cleanouts at the house and at property line

New connection to city main with appropriate saddle or tap fitting

Bed pipe in washed gravel; backfill in lifts with compaction


Restoration

Restore landscape to rough grade

Replace sod, mulch, or small shrubs (major landscaping priced separately)

Replace concrete or hardscape where cut (saw-cut and repour; aesthetic match may be imperfect)

Final cleanup and haul-off


Inspection & closeout

AHJ inspection (open-trench: before backfill; trenchless: at cleanouts)

Final video inspection documenting new line

Homeowner walkthrough

02Schedule

reqai rewritable

Estimated duration:

**Open-trench:** 2–5 working days depending on length and hardscape

**Trenchless pipe-bursting:** 1–2 working days


Water and sewer service is typically restored by end of each working day; a porta-potty can be staged on-site if needed for longer outages.


Start date: {{start_date}}.

03Investment

req

Total contract price: {{total}}


**Deposit: {{deposit}}** — signing (covers permit and mobilization)

**Balance: remainder** — upon completion, inspection pass, and restoration walk-through

04Payment Terms

req

Balance due at completion. Insurance claims (if covered by homeowner's policy) reimbursed directly by carrier; {{client_name}} remains responsible for the total contract price regardless of insurance outcome.


Invoices are due upon receipt. Payments more than ten (10) calendar days past due accrue a service charge of one and one-half percent (1.5%) per month on the unpaid balance, or the maximum rate permitted by law, whichever is less. {{contractor_name}} reserves the right to stop work and preserve lien rights if any progress payment is not received within five (5) business days of the due date. All retained mechanic's lien, stop notice, and bond rights under applicable state law are preserved.

05Exclusions

reqai rewritable

The following items are specifically NOT included in the contract price and are the responsibility of {{client_name}} unless added by written Change Order:


Permits, plan-review fees, and jurisdictional inspection fees unless explicitly itemized above

Repair or remediation of pre-existing code violations discovered during the work

Asbestos, lead paint, mold, or other hazardous material abatement

Structural engineering, architectural drawings, or third-party design services

Finish selections, fixtures, or appliances not listed in the itemized scope

Work on concealed systems (electrical, plumbing, HVAC, framing) beyond the points of connection identified

Landscaping restoration beyond returning disturbed areas to rough grade

Post-completion cleaning beyond construction broom-clean

Hardscape replacement beyond the cut area (full patio or driveway redo priced separately)

Landscape restoration beyond rough grade and basic sod repair

Tree removal along the lateral route (priced separately if required)

Water line replacement (separate scope; see whole-home repipe for interior supply)

Point-of-entry backflow preventer (if required by local code)

City tap fees or sewer connection fees charged by the municipality (reimbursed at cost if paid by contractor)

06Assumptions

reqai rewritable

This proposal is based on the following assumptions. If any assumption is incorrect, the contract price and schedule are subject to adjustment by Change Order:


Site access is available during normal working hours (7am–5pm, Monday–Saturday)

Adequate parking is available within 100 feet of the work area

Electrical power and potable water are available on-site at no cost to contractor

Existing structural elements, waste lines, water supply, and electrical service are in serviceable condition unless noted

{{client_name}} will remove personal property, artwork, and valuables from the work area prior to start

Work is based on a single mobilization; re-mobilization required due to delays outside contractor's control will be billed at current rates

Existing lateral route can be located via scope or marker

No major utilities (gas, electric, water) cross the lateral route requiring relocation

Soil conditions are typical; extreme rock or hardpan may require additional equipment (itemized)

City tap inspection availability within 5 business days of contractor readiness

07Change Order Process

req

Any modification to the scope, specifications, materials, or schedule set forth in this agreement must be authorized in writing as a Change Order signed by both parties before the work is performed. Each Change Order will describe the modified scope, any adjustment to the contract price, and any impact on the schedule. Verbal instructions do not modify this agreement. Additional time and cost associated with unforeseen conditions — including but not limited to concealed rot, asbestos, mold, faulty prior installation, unmarked utilities, or code-required upgrades triggered by the work — will be documented as a Change Order and billed at the rates stated in this proposal or at {{contractor_name}}'s then-current published labor rates, whichever is in effect at the time the condition is discovered.

08Warranty

reqai rewritable

{{contractor_name}} warrants the workmanship of the installed work for a period of one (1) year from the date of substantial completion. Manufacturer warranties on materials and equipment pass through to {{client_name}} as provided by the manufacturer and are the exclusive source of any material warranty. This warranty does not cover normal wear, abuse, neglect, acts of God, subsequent work performed by others, damage from settlement or movement of the building, or modifications to the installed work performed without written consent. To make a warranty claim, {{client_name}} must notify {{contractor_name}} in writing within thirty (30) days of discovering the alleged defect and allow reasonable access to inspect and repair.

09Validity & Acceptance

req

This proposal is valid for 30 days from the proposal date ({{proposal_date}}). Pricing is subject to change after that date due to material market fluctuations and scheduling availability. Acceptance requires signature below and receipt of the deposit amount stated in Payment Terms. Upon acceptance, this proposal, together with any attached specifications and subsequent written Change Orders, constitutes the complete agreement between the parties and supersedes any prior oral or written discussions.

10Signatures

req

**{{contractor_name}}** — License {{contractor_license}}


By: ________________________ Date: ______________


Print Name: ________________________



**{{client_name}}** — Owner / Authorized Representative


By: ________________________ Date: ______________


Print Name: ________________________


Property Address: {{client_address}}

Default payment terms

50% deposit due at signing, 40% on rough-in / mid-project milestone, 10% on substantial completion

Legal notes

  • · {{contractor_name}} warrants lateral replacement for 10 years against installation defect (does not cover root intrusion from future tree growth or third-party damage).
  • · Pipe manufacturer warranty (25+ years PVC; 100 years HDPE) registered under {{client_name}}.
  • · Some homeowner policies cover sewer lateral failure. {{client_name}} is responsible for insurance claim filing; {{contractor_name}} provides documentation and invoices on request.