Pool Equipment Upgrade

VSP pump, cartridge filter, salt system, and automation upgrade

Upgrade of pool equipment pad — variable-speed pump (VSP), cartridge filter, salt chlorine generator, and automation controller. Covers removal of old equipment and install of new. Priced at $3,800–$9,500 depending on component tier.

Sections

10

Variables

14

Word count

~1100

Validity

30 days

Variables you'll fill in

{{client_name}}

Client namereq

e.g. Jane Homeowner

{{client_address}}

Project addressreq

e.g. 1234 Main St, Phoenix AZ 85001

{{contractor_name}}

Your company namereq

e.g. Acme Construction LLC

{{contractor_license}}

License numberreq

e.g. ROC 123456

{{scope_summary}}

One-paragraph scope summaryreq

e.g. Describe what this project covers in 2-3 sentences.

{{total}}

Total contract pricereq

e.g. 24500

{{deposit}}

Deposit / down paymentreq

e.g. 5000

{{start_date}}

Estimated start datereq

e.g. 2026-05-01

{{completion_date}}

Estimated substantial completionreq

e.g. 2026-06-15

{{proposal_date}}

Date of proposalreq

e.g. 2026-04-18

{{pump_spec}}

New pumpreq

e.g. Pentair IntelliFlo3 VSF 011068

{{filter_spec}}

New filterreq

e.g. Pentair Clean & Clear Plus 520 sq ft cartridge

{{salt_spec}}

Salt system

e.g. Pentair iChlor 30 for up to 30,000 gallons

{{automation_spec}}

Automation

e.g. Pentair IntelliCenter i8PS with SC3 screen

Section-by-section preview

01Scope of Work

reqai rewritable

This proposal covers equipment pad upgrade at {{client_address}}.


Equipment install

Pump: {{pump_spec}}

Filter: {{filter_spec}}

Salt system: {{salt_spec}}

Automation: {{automation_spec}}


Removal

Isolate electrical to pad, verify lockout/tagout

Drain equipment pad, disconnect plumbing at unions

Remove existing pump, filter, heater (if replacing), and controller

Haul-off old equipment


Install

Set new pump, filter, and salt cell on existing pad (pad replacement billable if existing is deteriorated)

Replumb as needed with schedule 40 PVC and clear unions

Install flex connectors (not PVC) between pump and rigid plumbing to reduce vibration (code in most jurisdictions)

Install 3-way valve for sanitizer feeder or chlorinator

Electrical: connect VSP to existing pump circuit (verify wire gauge is 10 AWG or larger for VSP performance); new RS-485 communication wiring for automation

Low-voltage wiring between controller, automation relays, and relay box


Commissioning

Prime pump; bleed air from filter

Set VSP schedule (typical: 2,200 RPM 8 hrs/day for main turnover)

Set salt cell output to target PPM (typically 3,000 PPM)

Configure automation: schedules, freeze protection, spa-to-pool mode (if applicable)

App setup: connect IntelliCenter to homeowner Wi-Fi and mobile device

Water balance: alkalinity, pH, cyanuric, salt, calcium hardness


Energy-rebate documentation:

Provide AHRI certificate (equivalent) / pump specification sheet for utility VSP rebate submission

02Schedule

reqai rewritable

Estimated duration: 1–2 working days.


Start date: {{start_date}}. Pool is offline for 4–12 hours during changeover.

03Investment

req

Total contract price: {{total}}


**Deposit: {{deposit}}** — signing

**Balance: remainder** — at commissioning


**Utility rebate:** Many utilities offer $100–$400 rebates for ENERGY STAR VSP pumps. {{contractor_name}} provides receipt and specification sheet.

04Payment Terms

req

Balance due at commissioning.


Invoices are due upon receipt. Payments more than ten (10) calendar days past due accrue a service charge of one and one-half percent (1.5%) per month on the unpaid balance, or the maximum rate permitted by law, whichever is less. {{contractor_name}} reserves the right to stop work and preserve lien rights if any progress payment is not received within five (5) business days of the due date. All retained mechanic's lien, stop notice, and bond rights under applicable state law are preserved.

05Exclusions

reqai rewritable

The following items are specifically NOT included in the contract price and are the responsibility of {{client_name}} unless added by written Change Order:


Permits, plan-review fees, and jurisdictional inspection fees unless explicitly itemized above

Repair or remediation of pre-existing code violations discovered during the work

Asbestos, lead paint, mold, or other hazardous material abatement

Structural engineering, architectural drawings, or third-party design services

Finish selections, fixtures, or appliances not listed in the itemized scope

Work on concealed systems (electrical, plumbing, HVAC, framing) beyond the points of connection identified

Landscaping restoration beyond returning disturbed areas to rough grade

Post-completion cleaning beyond construction broom-clean

Plumbing replacement beyond immediate pad area

Gas heater (priced separately)

Heat pump heater (priced separately)

In-floor cleaning system modifications

Dedicated booster pump for pressure-side cleaners

Electrical service upgrade beyond existing pad capacity

Equipment pad concrete work

06Assumptions

reqai rewritable

This proposal is based on the following assumptions. If any assumption is incorrect, the contract price and schedule are subject to adjustment by Change Order:


Site access is available during normal working hours (7am–5pm, Monday–Saturday)

Adequate parking is available within 100 feet of the work area

Electrical power and potable water are available on-site at no cost to contractor

Existing structural elements, waste lines, water supply, and electrical service are in serviceable condition unless noted

{{client_name}} will remove personal property, artwork, and valuables from the work area prior to start

Work is based on a single mobilization; re-mobilization required due to delays outside contractor's control will be billed at current rates

Existing electrical service has capacity (VSPs have reduced amp draw vs. single-speed, but automation relays may add load)

Existing pad size accommodates new equipment footprint

Pool is in operating condition at start (non-operating pools priced separately for start-up chemistry)

07Change Order Process

req

Any modification to the scope, specifications, materials, or schedule set forth in this agreement must be authorized in writing as a Change Order signed by both parties before the work is performed. Each Change Order will describe the modified scope, any adjustment to the contract price, and any impact on the schedule. Verbal instructions do not modify this agreement. Additional time and cost associated with unforeseen conditions — including but not limited to concealed rot, asbestos, mold, faulty prior installation, unmarked utilities, or code-required upgrades triggered by the work — will be documented as a Change Order and billed at the rates stated in this proposal or at {{contractor_name}}'s then-current published labor rates, whichever is in effect at the time the condition is discovered.

08Warranty

reqai rewritable

{{contractor_name}} warrants the workmanship of the installed work for a period of one (1) year from the date of substantial completion. Manufacturer warranties on materials and equipment pass through to {{client_name}} as provided by the manufacturer and are the exclusive source of any material warranty. This warranty does not cover normal wear, abuse, neglect, acts of God, subsequent work performed by others, damage from settlement or movement of the building, or modifications to the installed work performed without written consent. To make a warranty claim, {{client_name}} must notify {{contractor_name}} in writing within thirty (30) days of discovering the alleged defect and allow reasonable access to inspect and repair.

09Validity & Acceptance

req

This proposal is valid for 30 days from the proposal date ({{proposal_date}}). Pricing is subject to change after that date due to material market fluctuations and scheduling availability. Acceptance requires signature below and receipt of the deposit amount stated in Payment Terms. Upon acceptance, this proposal, together with any attached specifications and subsequent written Change Orders, constitutes the complete agreement between the parties and supersedes any prior oral or written discussions.

10Signatures

req

**{{contractor_name}}** — License {{contractor_license}}


By: ________________________ Date: ______________


Print Name: ________________________



**{{client_name}}** — Owner / Authorized Representative


By: ________________________ Date: ______________


Print Name: ________________________


Property Address: {{client_address}}

Default payment terms

50% deposit due at signing, 40% on rough-in / mid-project milestone, 10% on substantial completion

Legal notes

  • · Manufacturer warranties (3 years Pentair IntelliFlo, 5 years filter, 3-year salt cell) registered under {{client_name}}.
  • · VSP pumps are required by law in many states for pools 1,500 gallons or larger (APSP/DOE compliance).
  • · Automation controller requires home Wi-Fi for remote operation; cellular backup available at additional cost.

Ready to send this one?

Use this template kicks you into the ProJobCalc proposal builder with the scope, exclusions, payment terms, and variables pre-loaded.

Use this template