Paver Patio Install

Interlocking paver patio with compacted base and polymeric sand joints

New paver patio install with proper base preparation, interlocking paver field, and polymeric sand joints. Priced for 200–800 sq ft patios at $6,500–$24,500 depending on paver material and layout complexity.

Sections

10

Variables

13

Word count

~1300

Validity

30 days

Variables you'll fill in

{{client_name}}

Client namereq

e.g. Jane Homeowner

{{client_address}}

Project addressreq

e.g. 1234 Main St, Phoenix AZ 85001

{{contractor_name}}

Your company namereq

e.g. Acme Construction LLC

{{contractor_license}}

License numberreq

e.g. ROC 123456

{{scope_summary}}

One-paragraph scope summaryreq

e.g. Describe what this project covers in 2-3 sentences.

{{total}}

Total contract pricereq

e.g. 24500

{{deposit}}

Deposit / down paymentreq

e.g. 5000

{{start_date}}

Estimated start datereq

e.g. 2026-05-01

{{completion_date}}

Estimated substantial completionreq

e.g. 2026-06-15

{{proposal_date}}

Date of proposalreq

e.g. 2026-04-18

{{patio_sqft}}

Patio square footagereq

e.g. 420

{{paver_selection}}

Paver selectionreq

e.g. Belgard Dublin Cobble — Bella Autumn blend, 6x9 & 9x9 mix

{{pattern}}

Laying patternreq

e.g. Herringbone with soldier course border

Section-by-section preview

01Scope of Work

reqai rewritable

This proposal covers a new paver patio install at {{client_address}} — {{patio_sqft}} sq ft of {{paver_selection}} in {{pattern}} pattern.


Excavation & base

Layout patio footprint per approved design

Excavate to a depth of 8"–10" below finished patio grade (6" base + paver thickness + bedding sand)

Haul-off of excavated soil

Install non-woven geotextile fabric over subgrade (prevents aggregate migration into soil)

Install 4"–6" of compacted 3/4-minus aggregate base, placed in 2"–3" lifts and compacted with plate compactor

Install 1" of bedding sand (screeded flat to final grade)


Paver install

Set pavers per {{pattern}} pattern, starting from a known edge

Cut pavers with wet saw for edges and curves (PPE used for silica dust safety per OSHA)

Install edge restraint (plastic snap-edge or concrete curb) around perimeter

Compact pavers with plate compactor (rubber pad protects surface)

Install polymeric sand in joints; activate with water and cure per manufacturer spec


Drainage

Pitch patio away from house (minimum 1% slope, target 2%)

Coordinate with downspouts if patio intersects roof drainage; discharge away from patio surface


Closeout

Final sweep and clean

Homeowner walkthrough; review care guide

02Schedule

reqai rewritable

Estimated duration: 3–7 working days depending on patio size and layout complexity.


Start date: {{start_date}}. Weather delays avoid work in sustained rain (polymeric sand install requires dry conditions).

03Investment

req

Total contract price: {{total}}


**Deposit: {{deposit}}** — signing

**Balance: remainder** — at completion and walk-through

04Payment Terms

req

Balance due at completion.


Invoices are due upon receipt. Payments more than ten (10) calendar days past due accrue a service charge of one and one-half percent (1.5%) per month on the unpaid balance, or the maximum rate permitted by law, whichever is less. {{contractor_name}} reserves the right to stop work and preserve lien rights if any progress payment is not received within five (5) business days of the due date. All retained mechanic's lien, stop notice, and bond rights under applicable state law are preserved.

05Exclusions

reqai rewritable

The following items are specifically NOT included in the contract price and are the responsibility of {{client_name}} unless added by written Change Order:


Permits, plan-review fees, and jurisdictional inspection fees unless explicitly itemized above

Repair or remediation of pre-existing code violations discovered during the work

Asbestos, lead paint, mold, or other hazardous material abatement

Structural engineering, architectural drawings, or third-party design services

Finish selections, fixtures, or appliances not listed in the itemized scope

Work on concealed systems (electrical, plumbing, HVAC, framing) beyond the points of connection identified

Landscaping restoration beyond returning disturbed areas to rough grade

Post-completion cleaning beyond construction broom-clean

Demolition of existing concrete or asphalt patio (priced separately; typically $3–$6 per sq ft)

Retaining walls adjacent to patio

Pergola, firepit, or outdoor kitchen (priced separately)

Outdoor electrical (lighting circuits, receptacles)

Grading beyond the patio footprint for drainage

Landscape restoration beyond patio edges (itemized if needed)

06Assumptions

reqai rewritable

This proposal is based on the following assumptions. If any assumption is incorrect, the contract price and schedule are subject to adjustment by Change Order:


Site access is available during normal working hours (7am–5pm, Monday–Saturday)

Adequate parking is available within 100 feet of the work area

Electrical power and potable water are available on-site at no cost to contractor

Existing structural elements, waste lines, water supply, and electrical service are in serviceable condition unless noted

{{client_name}} will remove personal property, artwork, and valuables from the work area prior to start

Work is based on a single mobilization; re-mobilization required due to delays outside contractor's control will be billed at current rates

Existing subgrade is typical soil (no major fill removal or soil stabilization required)

Site has access for mini-excavator or skid-steer if needed

No utility conflicts in excavation path (811 verifies)

07Change Order Process

req

Any modification to the scope, specifications, materials, or schedule set forth in this agreement must be authorized in writing as a Change Order signed by both parties before the work is performed. Each Change Order will describe the modified scope, any adjustment to the contract price, and any impact on the schedule. Verbal instructions do not modify this agreement. Additional time and cost associated with unforeseen conditions — including but not limited to concealed rot, asbestos, mold, faulty prior installation, unmarked utilities, or code-required upgrades triggered by the work — will be documented as a Change Order and billed at the rates stated in this proposal or at {{contractor_name}}'s then-current published labor rates, whichever is in effect at the time the condition is discovered.

08Warranty

reqai rewritable

{{contractor_name}} warrants the workmanship of the installed work for a period of one (1) year from the date of substantial completion. Manufacturer warranties on materials and equipment pass through to {{client_name}} as provided by the manufacturer and are the exclusive source of any material warranty. This warranty does not cover normal wear, abuse, neglect, acts of God, subsequent work performed by others, damage from settlement or movement of the building, or modifications to the installed work performed without written consent. To make a warranty claim, {{client_name}} must notify {{contractor_name}} in writing within thirty (30) days of discovering the alleged defect and allow reasonable access to inspect and repair.

09Validity & Acceptance

req

This proposal is valid for 30 days from the proposal date ({{proposal_date}}). Pricing is subject to change after that date due to material market fluctuations and scheduling availability. Acceptance requires signature below and receipt of the deposit amount stated in Payment Terms. Upon acceptance, this proposal, together with any attached specifications and subsequent written Change Orders, constitutes the complete agreement between the parties and supersedes any prior oral or written discussions.

10Signatures

req

**{{contractor_name}}** — License {{contractor_license}}


By: ________________________ Date: ______________


Print Name: ________________________



**{{client_name}}** — Owner / Authorized Representative


By: ________________________ Date: ______________


Print Name: ________________________


Property Address: {{client_address}}

Default payment terms

50% deposit due at signing, 40% on rough-in / mid-project milestone, 10% on substantial completion

Legal notes

  • · {{contractor_name}} warrants workmanship for 2 years: pavers will not sink, shift, or separate more than 1/4" under normal residential use.
  • · Paver manufacturer warranty (lifetime on paver integrity for most brands) passes through to {{client_name}}.
  • · Polymeric sand may require re-application every 5–10 years as part of normal maintenance (not a warranty item).

Ready to send this one?

Use this template kicks you into the ProJobCalc proposal builder with the scope, exclusions, payment terms, and variables pre-loaded.

Use this template