Heat Pump Conversion (Gas Furnace to Electric Heat Pump)

Replace gas furnace + AC with a high-efficiency electric heat pump system

Conversion of a gas-furnace + AC split system to an all-electric heat pump with integrated air handler. Scope includes removal of gas furnace, gas-line cap, new heat pump condenser, variable-speed air handler, and commissioning. Priced for 3–5 ton systems, eligible for IRA/utility rebates.

Sections

10

Variables

14

Word count

~1600

Validity

30 days

Variables you'll fill in

{{client_name}}

Client namereq

e.g. Jane Homeowner

{{client_address}}

Project addressreq

e.g. 1234 Main St, Phoenix AZ 85001

{{contractor_name}}

Your company namereq

e.g. Acme Construction LLC

{{contractor_license}}

License numberreq

e.g. ROC 123456

{{scope_summary}}

One-paragraph scope summaryreq

e.g. Describe what this project covers in 2-3 sentences.

{{total}}

Total contract pricereq

e.g. 24500

{{deposit}}

Deposit / down paymentreq

e.g. 5000

{{start_date}}

Estimated start datereq

e.g. 2026-05-01

{{completion_date}}

Estimated substantial completionreq

e.g. 2026-06-15

{{proposal_date}}

Date of proposalreq

e.g. 2026-04-18

{{system_tonnage}}

System tonnagereq

e.g. 4 ton

{{heat_pump_model}}

Heat pump make & modelreq

e.g. Mitsubishi Hyper-Heat MXZ-SM60NAMHZ + PVA-A42AA7

{{backup_heat_kw}}

Backup heat strip (kW)

e.g. 10 kW strip heat

{{eligible_rebates}}

Eligible rebates

e.g. IRA 25C tax credit (up to $2,000); utility rebate $800

Section-by-section preview

01Scope of Work

reqai rewritable

This proposal covers conversion of the existing gas-furnace + AC system at {{client_address}} to an all-electric heat pump system.


Removal

Recover refrigerant from existing AC per EPA §608

Disconnect and remove existing gas furnace, cap gas line at closest accessible joint, and tag

Remove existing AC condenser, evaporator coil, refrigerant lines (if incompatible with new system)

Haul-off all old equipment and dispose per local regulations


Install

Install new {{heat_pump_model}} condenser on new isolation pad

Install new variable-speed air handler in existing mechanical space

Replace refrigerant line set if existing is incompatible or undersized

Install new condensate drain with float switch and secondary drain pan

Install {{backup_heat_kw}} (if selected) for supplemental heat on coldest days

New electrical whip, disconnect, and dedicated breakers for condenser and air handler (panel capacity verified; upgrade priced separately if needed)

Low-voltage thermostat wire to new communicating thermostat


Commissioning

Evacuate and charge new refrigerant per manufacturer weigh-in

Verify heating and cooling mode operation, defrost cycle, and static pressure

Set up communicating thermostat, Wi-Fi integration, and homeowner walkthrough

Register manufacturer warranty (10-year parts on most systems)


**Rebate documentation:** {{contractor_name}} provides AHRI certificate, equipment serial numbers, and signed invoice sufficient for federal 25C tax credit and utility rebate applications. {{eligible_rebates}}

02Schedule

reqai rewritable

Estimated duration: 1–2 working days.


**Day 1:** Removal of old equipment, set new condenser and air handler, refrigerant line set

**Day 2 (if needed):** Electrical work, commissioning, thermostat setup, walkthrough


Start date: {{start_date}}.

03Investment

req

**Total contract price: {{total}}** (before rebates and tax credits)


**Deposit: {{deposit}}** — at signing

**Balance: remainder** — at commissioning


**Estimated customer cost after incentives:** depends on eligibility for federal 25C tax credit (up to $2,000 on qualifying heat pumps) and any applicable utility rebate. {{contractor_name}} does not guarantee rebate amounts or timelines; rebate and tax-credit eligibility is {{client_name}}'s responsibility to verify.

04Payment Terms

req

Balance due same-day at commissioning. Financing options available through third-party lenders. {{contractor_name}} submits rebate documentation within 7 business days of project completion; rebate checks are sent by the utility or IRS directly to {{client_name}}.


Invoices are due upon receipt. Payments more than ten (10) calendar days past due accrue a service charge of one and one-half percent (1.5%) per month on the unpaid balance, or the maximum rate permitted by law, whichever is less. {{contractor_name}} reserves the right to stop work and preserve lien rights if any progress payment is not received within five (5) business days of the due date. All retained mechanic's lien, stop notice, and bond rights under applicable state law are preserved.

05Exclusions

reqai rewritable

The following items are specifically NOT included in the contract price and are the responsibility of {{client_name}} unless added by written Change Order:


Permits, plan-review fees, and jurisdictional inspection fees unless explicitly itemized above

Repair or remediation of pre-existing code violations discovered during the work

Asbestos, lead paint, mold, or other hazardous material abatement

Structural engineering, architectural drawings, or third-party design services

Finish selections, fixtures, or appliances not listed in the itemized scope

Work on concealed systems (electrical, plumbing, HVAC, framing) beyond the points of connection identified

Landscaping restoration beyond returning disturbed areas to rough grade

Post-completion cleaning beyond construction broom-clean

Electrical panel upgrade (200A service upgrade typically $2,800–$5,200, priced separately)

Duct replacement or modification

Insulation upgrades to improve heat pump performance

Smart home integration beyond basic Wi-Fi thermostat

Removal of existing gas meter or main gas line shutoff (coordinate with gas utility)

IRA tax-credit filing assistance (consult CPA; {{contractor_name}} provides AHRI certificate)

06Assumptions

reqai rewritable

This proposal is based on the following assumptions. If any assumption is incorrect, the contract price and schedule are subject to adjustment by Change Order:


Site access is available during normal working hours (7am–5pm, Monday–Saturday)

Adequate parking is available within 100 feet of the work area

Electrical power and potable water are available on-site at no cost to contractor

Existing structural elements, waste lines, water supply, and electrical service are in serviceable condition unless noted

{{client_name}} will remove personal property, artwork, and valuables from the work area prior to start

Work is based on a single mobilization; re-mobilization required due to delays outside contractor's control will be billed at current rates

Existing electrical panel has 60A+ capacity available for the new heat pump system

Existing ductwork is in acceptable condition for heat pump airflow (static pressure under 0.5" WC)

{{client_name}} understands cold-climate heat pump operation and backup strip heat engagement below rated temperature

07Change Order Process

req

Any modification to the scope, specifications, materials, or schedule set forth in this agreement must be authorized in writing as a Change Order signed by both parties before the work is performed. Each Change Order will describe the modified scope, any adjustment to the contract price, and any impact on the schedule. Verbal instructions do not modify this agreement. Additional time and cost associated with unforeseen conditions — including but not limited to concealed rot, asbestos, mold, faulty prior installation, unmarked utilities, or code-required upgrades triggered by the work — will be documented as a Change Order and billed at the rates stated in this proposal or at {{contractor_name}}'s then-current published labor rates, whichever is in effect at the time the condition is discovered.

08Warranty

reqai rewritable

{{contractor_name}} warrants the workmanship of the installed work for a period of one (1) year from the date of substantial completion. Manufacturer warranties on materials and equipment pass through to {{client_name}} as provided by the manufacturer and are the exclusive source of any material warranty. This warranty does not cover normal wear, abuse, neglect, acts of God, subsequent work performed by others, damage from settlement or movement of the building, or modifications to the installed work performed without written consent. To make a warranty claim, {{client_name}} must notify {{contractor_name}} in writing within thirty (30) days of discovering the alleged defect and allow reasonable access to inspect and repair.

09Validity & Acceptance

req

This proposal is valid for 30 days from the proposal date ({{proposal_date}}). Pricing is subject to change after that date due to material market fluctuations and scheduling availability. Acceptance requires signature below and receipt of the deposit amount stated in Payment Terms. Upon acceptance, this proposal, together with any attached specifications and subsequent written Change Orders, constitutes the complete agreement between the parties and supersedes any prior oral or written discussions.

10Signatures

req

**{{contractor_name}}** — License {{contractor_license}}


By: ________________________ Date: ______________


Print Name: ________________________



**{{client_name}}** — Owner / Authorized Representative


By: ________________________ Date: ______________


Print Name: ________________________


Property Address: {{client_address}}

Default payment terms

50% deposit due at signing, 40% on rough-in / mid-project milestone, 10% on substantial completion

Legal notes

  • · Equipment carries manufacturer 10-year parts warranty (registered). Compressor warranty typically 12 years.
  • · Labor warranty: 1 year standard; extended labor warranty plans available for purchase.
  • · AHRI certificate delivered with final invoice; required for 25C federal tax credit on 2026 tax returns.

Ready to send this one?

Use this template kicks you into the ProJobCalc proposal builder with the scope, exclusions, payment terms, and variables pre-loaded.

Use this template