Residential Fence Install

Wood, vinyl, or aluminum fence with gates

New fence installation covering post setting, panel or board install, and gates. Priced for 100–400 linear feet residential fencing in the $3,800–$18,500 range depending on material.

Sections

10

Variables

13

Word count

~1100

Validity

30 days

Variables you'll fill in

{{client_name}}

Client namereq

e.g. Jane Homeowner

{{client_address}}

Project addressreq

e.g. 1234 Main St, Phoenix AZ 85001

{{contractor_name}}

Your company namereq

e.g. Acme Construction LLC

{{contractor_license}}

License numberreq

e.g. ROC 123456

{{scope_summary}}

One-paragraph scope summaryreq

e.g. Describe what this project covers in 2-3 sentences.

{{total}}

Total contract pricereq

e.g. 24500

{{deposit}}

Deposit / down paymentreq

e.g. 5000

{{start_date}}

Estimated start datereq

e.g. 2026-05-01

{{completion_date}}

Estimated substantial completionreq

e.g. 2026-06-15

{{proposal_date}}

Date of proposalreq

e.g. 2026-04-18

{{fence_linear_feet}}

Linear feet of fencereq

e.g. 180

{{fence_material}}

Fence material & stylereq

e.g. 6' cedar dog-ear with stain

{{gate_count}}

Number of gatesreq

e.g. 2

Section-by-section preview

01Scope of Work

reqai rewritable

This proposal covers installation of {{fence_linear_feet}} linear feet of {{fence_material}} fencing at {{client_address}}, including {{gate_count}} gate(s).


Pre-install

Call 811 to mark underground utilities (minimum 3 business days before digging)

Layout per property survey or stakes provided by {{client_name}}; homeowner confirms property lines before post setting

Remove existing fence if needed (itemized separately if applicable)


Post setting

Dig post holes to appropriate depth (typically 30"–36" for 6' fence, below frost line in cold climates)

Set 4x4 pressure-treated posts (wood fence) or manufacturer-spec posts (vinyl/aluminum) in concrete

Spacing per material manufacturer requirements (typically 6'–8' on center for wood, 6' on center for vinyl)


Panel / board install

Install stringers and boards (wood) or panels (vinyl/aluminum) per manufacturer specs

Maintain consistent height and grade-following or stepped layout per customer preference

Gate install: heavy-duty hinges, self-closing for pool fencing where required by code


Finish

Stain and seal (if wood, included in this proposal)

Final walk-through and punch

Haul away all debris

02Schedule

reqai rewritable

Estimated duration: 3–5 business days depending on weather and fence length.


**Day 1:** Layout, 811 locates verification, existing fence removal if applicable

**Day 2:** Post holes and concrete pour

**Days 3–4:** Panel/board install after concrete cures (typically 24 hours)

**Day 5:** Gates, stain/seal, cleanup


Start date: {{start_date}}.

03Investment

req

Total contract price: {{total}}


Fixed-price payment schedule:


**Deposit: {{deposit}}** — signing

**Balance** — upon completion and customer walk-through

04Payment Terms

req

Deposit at signing; balance due upon completion.


Invoices are due upon receipt. Payments more than ten (10) calendar days past due accrue a service charge of one and one-half percent (1.5%) per month on the unpaid balance, or the maximum rate permitted by law, whichever is less. {{contractor_name}} reserves the right to stop work and preserve lien rights if any progress payment is not received within five (5) business days of the due date. All retained mechanic's lien, stop notice, and bond rights under applicable state law are preserved.

05Exclusions

reqai rewritable

The following items are specifically NOT included in the contract price and are the responsibility of {{client_name}} unless added by written Change Order:


Permits, plan-review fees, and jurisdictional inspection fees unless explicitly itemized above

Repair or remediation of pre-existing code violations discovered during the work

Asbestos, lead paint, mold, or other hazardous material abatement

Structural engineering, architectural drawings, or third-party design services

Finish selections, fixtures, or appliances not listed in the itemized scope

Work on concealed systems (electrical, plumbing, HVAC, framing) beyond the points of connection identified

Landscaping restoration beyond returning disturbed areas to rough grade

Post-completion cleaning beyond construction broom-clean

Property survey (if property lines are unclear, owner is responsible for engaging a surveyor)

Tree or root removal in fence line

Rock drilling or excavation through buried concrete/asphalt

HOA / permit approval process (owner responsibility unless retained by Change Order)

Pool-code compliance review for pool perimeter fencing (owner verifies local pool barrier requirements)

06Assumptions

reqai rewritable

This proposal is based on the following assumptions. If any assumption is incorrect, the contract price and schedule are subject to adjustment by Change Order:


Site access is available during normal working hours (7am–5pm, Monday–Saturday)

Adequate parking is available within 100 feet of the work area

Electrical power and potable water are available on-site at no cost to contractor

Existing structural elements, waste lines, water supply, and electrical service are in serviceable condition unless noted

{{client_name}} will remove personal property, artwork, and valuables from the work area prior to start

Work is based on a single mobilization; re-mobilization required due to delays outside contractor's control will be billed at current rates

07Change Order Process

req

Any modification to the scope, specifications, materials, or schedule set forth in this agreement must be authorized in writing as a Change Order signed by both parties before the work is performed. Each Change Order will describe the modified scope, any adjustment to the contract price, and any impact on the schedule. Verbal instructions do not modify this agreement. Additional time and cost associated with unforeseen conditions — including but not limited to concealed rot, asbestos, mold, faulty prior installation, unmarked utilities, or code-required upgrades triggered by the work — will be documented as a Change Order and billed at the rates stated in this proposal or at {{contractor_name}}'s then-current published labor rates, whichever is in effect at the time the condition is discovered.

08Warranty

reqai rewritable

{{contractor_name}} warrants the workmanship of the installed work for a period of one (1) year from the date of substantial completion. Manufacturer warranties on materials and equipment pass through to {{client_name}} as provided by the manufacturer and are the exclusive source of any material warranty. This warranty does not cover normal wear, abuse, neglect, acts of God, subsequent work performed by others, damage from settlement or movement of the building, or modifications to the installed work performed without written consent. To make a warranty claim, {{client_name}} must notify {{contractor_name}} in writing within thirty (30) days of discovering the alleged defect and allow reasonable access to inspect and repair.

09Validity & Acceptance

req

This proposal is valid for 30 days from the proposal date ({{proposal_date}}). Pricing is subject to change after that date due to material market fluctuations and scheduling availability. Acceptance requires signature below and receipt of the deposit amount stated in Payment Terms. Upon acceptance, this proposal, together with any attached specifications and subsequent written Change Orders, constitutes the complete agreement between the parties and supersedes any prior oral or written discussions.

10Signatures

req

**{{contractor_name}}** — License {{contractor_license}}


By: ________________________ Date: ______________


Print Name: ________________________



**{{client_name}}** — Owner / Authorized Representative


By: ________________________ Date: ______________


Print Name: ________________________


Property Address: {{client_address}}

Default payment terms

50% deposit due at signing, 40% on rough-in / mid-project milestone, 10% on substantial completion