Ductwork Replacement

Full residential ductwork replacement with sealed, insulated duct system

Complete replacement of existing residential ductwork. Covers removal of old metal or fiberboard ducts, install of new insulated flex or sheet-metal trunks with mastic-sealed joints, and balancing. Priced for 1,200–3,500 sq ft homes.

Sections

10

Variables

14

Word count

~1300

Validity

30 days

Variables you'll fill in

{{client_name}}

Client namereq

e.g. Jane Homeowner

{{client_address}}

Project addressreq

e.g. 1234 Main St, Phoenix AZ 85001

{{contractor_name}}

Your company namereq

e.g. Acme Construction LLC

{{contractor_license}}

License numberreq

e.g. ROC 123456

{{scope_summary}}

One-paragraph scope summaryreq

e.g. Describe what this project covers in 2-3 sentences.

{{total}}

Total contract pricereq

e.g. 24500

{{deposit}}

Deposit / down paymentreq

e.g. 5000

{{start_date}}

Estimated start datereq

e.g. 2026-05-01

{{completion_date}}

Estimated substantial completionreq

e.g. 2026-06-15

{{proposal_date}}

Date of proposalreq

e.g. 2026-04-18

{{home_sqft}}

Home square footagereq

e.g. 2200

{{return_count}}

Number of return grillesreq

e.g. 2 returns (master + hallway)

{{supply_count}}

Number of supply registersreq

e.g. 12 supply registers

{{duct_spec}}

Duct specificationreq

e.g. R-8 insulated flex on branches; 26ga galvanized sheet metal trunks

Section-by-section preview

01Scope of Work

reqai rewritable

This proposal covers complete replacement of the residential ductwork at {{client_address}} — approximately {{home_sqft}} sq ft with {{return_count}} and {{supply_count}}.


Removal

Protect flooring and furniture with drop cloths along work paths

Remove existing supply plenums, trunks, branches, and return lines

Haul-off and dispose of old ductwork


New duct install

Install {{duct_spec}}

Seal all joints with Mastic UL 181-approved sealant (no duct tape)

Pressure-test total duct leakage to ≤ 4 CFM25 per 100 sq ft conditioned area (2018 IECC standard)

Insulate supply trunks to R-8; return trunks to R-6

New boots at each register with sealed gaskets

New filter grille (if applicable) at return


Balancing

Airflow-test each register with anemometer

Adjust dampers to achieve design CFM per room per Manual D targets

Document airflow per register for {{client_name}}'s records


Closeout

Vacuum debris from registers

Reinstall existing register covers (or replace with new — itemized if selected)

Provide before/after static pressure reading

02Schedule

reqai rewritable

Estimated duration: 2–4 working days depending on attic accessibility and system complexity.


**Day 1:** Removal of old ducts

**Days 2–3:** New trunk and branch install, mastic sealing

**Day 4:** Insulation, pressure test, balancing, walkthrough


Start date: {{start_date}}.

03Investment

req

Total contract price: {{total}}


Fixed-price:


**Deposit: {{deposit}}** — signing

**Balance: remainder** — at substantial completion and balancing report delivery

04Payment Terms

req

Balance due same-day at completion. Balancing report and static pressure measurements delivered with final invoice.


Invoices are due upon receipt. Payments more than ten (10) calendar days past due accrue a service charge of one and one-half percent (1.5%) per month on the unpaid balance, or the maximum rate permitted by law, whichever is less. {{contractor_name}} reserves the right to stop work and preserve lien rights if any progress payment is not received within five (5) business days of the due date. All retained mechanic's lien, stop notice, and bond rights under applicable state law are preserved.

05Exclusions

reqai rewritable

The following items are specifically NOT included in the contract price and are the responsibility of {{client_name}} unless added by written Change Order:


Permits, plan-review fees, and jurisdictional inspection fees unless explicitly itemized above

Repair or remediation of pre-existing code violations discovered during the work

Asbestos, lead paint, mold, or other hazardous material abatement

Structural engineering, architectural drawings, or third-party design services

Finish selections, fixtures, or appliances not listed in the itemized scope

Work on concealed systems (electrical, plumbing, HVAC, framing) beyond the points of connection identified

Landscaping restoration beyond returning disturbed areas to rough grade

Post-completion cleaning beyond construction broom-clean

Drywall repair for register cutouts in new locations (priced per cutout if layout changes)

Zoning system install (variable-speed zoning priced separately)

Radiant ceiling or floor-register relocation

Return drop duct relocation (if moving return to new location)

Removal of asbestos-containing duct wrap (required in pre-1980 homes; abatement priced separately with certified contractor)

06Assumptions

reqai rewritable

This proposal is based on the following assumptions. If any assumption is incorrect, the contract price and schedule are subject to adjustment by Change Order:


Site access is available during normal working hours (7am–5pm, Monday–Saturday)

Adequate parking is available within 100 feet of the work area

Electrical power and potable water are available on-site at no cost to contractor

Existing structural elements, waste lines, water supply, and electrical service are in serviceable condition unless noted

{{client_name}} will remove personal property, artwork, and valuables from the work area prior to start

Work is based on a single mobilization; re-mobilization required due to delays outside contractor's control will be billed at current rates

Attic or crawlspace access is available and safe for workers

Existing system capacity is correctly sized (if replacing ducts exposes undersized equipment, may require Change Order)

Register and return grille locations remain the same (layout changes priced separately)

07Change Order Process

req

Any modification to the scope, specifications, materials, or schedule set forth in this agreement must be authorized in writing as a Change Order signed by both parties before the work is performed. Each Change Order will describe the modified scope, any adjustment to the contract price, and any impact on the schedule. Verbal instructions do not modify this agreement. Additional time and cost associated with unforeseen conditions — including but not limited to concealed rot, asbestos, mold, faulty prior installation, unmarked utilities, or code-required upgrades triggered by the work — will be documented as a Change Order and billed at the rates stated in this proposal or at {{contractor_name}}'s then-current published labor rates, whichever is in effect at the time the condition is discovered.

08Warranty

reqai rewritable

{{contractor_name}} warrants the workmanship of the installed work for a period of one (1) year from the date of substantial completion. Manufacturer warranties on materials and equipment pass through to {{client_name}} as provided by the manufacturer and are the exclusive source of any material warranty. This warranty does not cover normal wear, abuse, neglect, acts of God, subsequent work performed by others, damage from settlement or movement of the building, or modifications to the installed work performed without written consent. To make a warranty claim, {{client_name}} must notify {{contractor_name}} in writing within thirty (30) days of discovering the alleged defect and allow reasonable access to inspect and repair.

09Validity & Acceptance

req

This proposal is valid for 30 days from the proposal date ({{proposal_date}}). Pricing is subject to change after that date due to material market fluctuations and scheduling availability. Acceptance requires signature below and receipt of the deposit amount stated in Payment Terms. Upon acceptance, this proposal, together with any attached specifications and subsequent written Change Orders, constitutes the complete agreement between the parties and supersedes any prior oral or written discussions.

10Signatures

req

**{{contractor_name}}** — License {{contractor_license}}


By: ________________________ Date: ______________


Print Name: ________________________



**{{client_name}}** — Owner / Authorized Representative


By: ________________________ Date: ______________


Print Name: ________________________


Property Address: {{client_address}}

Default payment terms

50% deposit due at signing, 40% on rough-in / mid-project milestone, 10% on substantial completion

Legal notes

  • · {{contractor_name}} provides post-install duct leakage test results and static pressure measurements as part of closeout.
  • · Utility rebates for duct air-sealing may be available in your area; {{contractor_name}} provides the technical documentation required for rebate application.