Chimney Masonry Repair

Tuckpoint, crown repair, flashing, and cap replacement for brick or stone chimney

Chimney masonry repair covering tuckpointing of deteriorated mortar, crown rebuild or cap, flashing repair, and chimney cap installation. Priced at $1,400–$5,800 depending on height and extent.

Sections

10

Variables

13

Word count

~1200

Validity

30 days

Variables you'll fill in

{{client_name}}

Client namereq

e.g. Jane Homeowner

{{client_address}}

Project addressreq

e.g. 1234 Main St, Phoenix AZ 85001

{{contractor_name}}

Your company namereq

e.g. Acme Construction LLC

{{contractor_license}}

License numberreq

e.g. ROC 123456

{{scope_summary}}

One-paragraph scope summaryreq

e.g. Describe what this project covers in 2-3 sentences.

{{total}}

Total contract pricereq

e.g. 24500

{{deposit}}

Deposit / down paymentreq

e.g. 5000

{{start_date}}

Estimated start datereq

e.g. 2026-05-01

{{completion_date}}

Estimated substantial completionreq

e.g. 2026-06-15

{{proposal_date}}

Date of proposalreq

e.g. 2026-04-18

{{chimney_height}}

Chimney height above roofreq

e.g. 6 feet

{{tuckpoint_sqft}}

Tuckpointing square footagereq

e.g. 28 sq ft (Face A and B, upper 4 feet)

{{crown_condition}}

Crown conditionreq

e.g. Cracked concrete crown, install new poured crown

Section-by-section preview

01Scope of Work

reqai rewritable

This proposal covers masonry repair of the chimney at {{client_address}} — {{chimney_height}} above roof. Scope includes:


Access & setup

Set up scaffolding or ladder access per OSHA

Protect roof and landscape below with tarps


**Tuckpointing** ({{tuckpoint_sqft}})

Grind out deteriorated mortar joints to 3/4"–1" depth

Clean joints; pre-wet brick

Repoint with Type N or O mortar matching existing color and tool profile

Strike joints to match existing


Crown repair

{{crown_condition}}

If rebuilding: remove old crown, install new poured concrete crown with 2" overhang and drip kerf

Or install pre-cast crown if sized correctly

Seal crown with silicone/acrylic crown sealer


Flashing

Inspect existing step flashing at roof intersections

Replace or reseal flashing at failure points

Install new counter-flashing where existing is damaged


Cap

Install stainless steel chimney cap with mesh spark arrestor (if flue has open top)

Sized to flue dimensions

Secured with stainless hardware (no aluminum in flue path)


Closeout

Clean debris from roof and gutters below

Homeowner walkthrough with photos

02Schedule

reqai rewritable

Estimated duration: 2–4 working days depending on weather and scope.


Start date: {{start_date}}. Mortar work requires temps above 40°F for minimum 48 hours after application.

03Investment

req

Total contract price: {{total}}


**Deposit: {{deposit}}** — signing

**Balance: remainder** — at completion and walkthrough

04Payment Terms

req

Balance due at completion.


Invoices are due upon receipt. Payments more than ten (10) calendar days past due accrue a service charge of one and one-half percent (1.5%) per month on the unpaid balance, or the maximum rate permitted by law, whichever is less. {{contractor_name}} reserves the right to stop work and preserve lien rights if any progress payment is not received within five (5) business days of the due date. All retained mechanic's lien, stop notice, and bond rights under applicable state law are preserved.

05Exclusions

reqai rewritable

The following items are specifically NOT included in the contract price and are the responsibility of {{client_name}} unless added by written Change Order:


Permits, plan-review fees, and jurisdictional inspection fees unless explicitly itemized above

Repair or remediation of pre-existing code violations discovered during the work

Asbestos, lead paint, mold, or other hazardous material abatement

Structural engineering, architectural drawings, or third-party design services

Finish selections, fixtures, or appliances not listed in the itemized scope

Work on concealed systems (electrical, plumbing, HVAC, framing) beyond the points of connection identified

Landscaping restoration beyond returning disturbed areas to rough grade

Post-completion cleaning beyond construction broom-clean

Flue liner replacement (separate chimney sweep / liner contractor)

Interior firebox repair

Full chimney rebuild (priced separately)

Removal of chimney (demolition; separate scope)

Gas fireplace service

Waterproofing beyond crown and flashing (siloxane treatment priced separately)

06Assumptions

reqai rewritable

This proposal is based on the following assumptions. If any assumption is incorrect, the contract price and schedule are subject to adjustment by Change Order:


Site access is available during normal working hours (7am–5pm, Monday–Saturday)

Adequate parking is available within 100 feet of the work area

Electrical power and potable water are available on-site at no cost to contractor

Existing structural elements, waste lines, water supply, and electrical service are in serviceable condition unless noted

{{client_name}} will remove personal property, artwork, and valuables from the work area prior to start

Work is based on a single mobilization; re-mobilization required due to delays outside contractor's control will be billed at current rates

Chimney is structurally sound (no major settlement or lean)

Brick/stone is in acceptable condition; major replacement priced per unit

Roof penetration flashing is the scope of the chimney contractor (not the roofer)

Access route to chimney allows ladder or scaffolding setup

07Change Order Process

req

Any modification to the scope, specifications, materials, or schedule set forth in this agreement must be authorized in writing as a Change Order signed by both parties before the work is performed. Each Change Order will describe the modified scope, any adjustment to the contract price, and any impact on the schedule. Verbal instructions do not modify this agreement. Additional time and cost associated with unforeseen conditions — including but not limited to concealed rot, asbestos, mold, faulty prior installation, unmarked utilities, or code-required upgrades triggered by the work — will be documented as a Change Order and billed at the rates stated in this proposal or at {{contractor_name}}'s then-current published labor rates, whichever is in effect at the time the condition is discovered.

08Warranty

reqai rewritable

{{contractor_name}} warrants the workmanship of the installed work for a period of one (1) year from the date of substantial completion. Manufacturer warranties on materials and equipment pass through to {{client_name}} as provided by the manufacturer and are the exclusive source of any material warranty. This warranty does not cover normal wear, abuse, neglect, acts of God, subsequent work performed by others, damage from settlement or movement of the building, or modifications to the installed work performed without written consent. To make a warranty claim, {{client_name}} must notify {{contractor_name}} in writing within thirty (30) days of discovering the alleged defect and allow reasonable access to inspect and repair.

09Validity & Acceptance

req

This proposal is valid for 30 days from the proposal date ({{proposal_date}}). Pricing is subject to change after that date due to material market fluctuations and scheduling availability. Acceptance requires signature below and receipt of the deposit amount stated in Payment Terms. Upon acceptance, this proposal, together with any attached specifications and subsequent written Change Orders, constitutes the complete agreement between the parties and supersedes any prior oral or written discussions.

10Signatures

req

**{{contractor_name}}** — License {{contractor_license}}


By: ________________________ Date: ______________


Print Name: ________________________



**{{client_name}}** — Owner / Authorized Representative


By: ________________________ Date: ______________


Print Name: ________________________


Property Address: {{client_address}}

Default payment terms

50% deposit due at signing, 40% on rough-in / mid-project milestone, 10% on substantial completion

Legal notes

  • · Workmanship warranty: 5 years on tuckpoint and crown; 2 years on flashing.
  • · Annual inspection recommended; {{contractor_name}} provides inspection service for previous customers at a discount.