Kitchen Cabinet Refinish

Strip or scuff-sand, prime, and spray-paint existing kitchen cabinets

Refinish existing kitchen cabinets with proper prep, high-quality primer, and sprayed cabinet-grade enamel. Priced for 20–40 cabinet openings at $4,500–$11,500 depending on complexity and finish selection.

Sections

10

Variables

13

Word count

~1300

Validity

30 days

Variables you'll fill in

{{client_name}}

Client namereq

e.g. Jane Homeowner

{{client_address}}

Project addressreq

e.g. 1234 Main St, Phoenix AZ 85001

{{contractor_name}}

Your company namereq

e.g. Acme Construction LLC

{{contractor_license}}

License numberreq

e.g. ROC 123456

{{scope_summary}}

One-paragraph scope summaryreq

e.g. Describe what this project covers in 2-3 sentences.

{{total}}

Total contract pricereq

e.g. 24500

{{deposit}}

Deposit / down paymentreq

e.g. 5000

{{start_date}}

Estimated start datereq

e.g. 2026-05-01

{{completion_date}}

Estimated substantial completionreq

e.g. 2026-06-15

{{proposal_date}}

Date of proposalreq

e.g. 2026-04-18

{{cabinet_count}}

Number of cabinet openings (doors + drawer fronts)req

e.g. 32 doors + 8 drawer fronts

{{cabinet_style}}

Cabinet style & current finishreq

e.g. Oak shaker doors with clear varnish (1995)

{{finish_color}}

New finish color & brandreq

e.g. SW Urbane Bronze SW 7048 — satin enamel

Section-by-section preview

01Scope of Work

reqai rewritable

This proposal covers a full refinish of {{cabinet_count}} at {{client_address}}. Current: {{cabinet_style}}. New finish: {{finish_color}}.


Removal & staging

Remove all cabinet doors and drawer fronts; label each for return to correct opening

Remove existing hardware; retain for reinstall (or replace with new if itemized)

Set up off-site shop or on-site garage spray booth (tented with plastic for overspray containment)


Prep

Degrease all surfaces with TSP or denatured alcohol

Scuff-sand with 220-grit; dust-off

For heavily varnished or glossy surfaces: apply bonding primer (Zinsser BIN or SW Extreme Bond)

Fill screw holes, dings, and dents with two-part wood filler; sand flush

Mask cabinet boxes in-place for box painting (or remove if full removal is in scope)


Primer

One coat bonding primer, sanded between coats with 320-grit

On dark-to-light color changes, apply second coat primer for opacity


Finish

Two coats cabinet-grade enamel (SW Emerald Urethane Trim Enamel, BM Advance, or equivalent)

Spray application for factory-smooth finish (HVLP gun)

Inter-coat sanding with 400-grit

24+ hour cure between coats


Reinstall

Return doors and drawer fronts to proper openings

Adjust hinges and alignment

Reinstall hardware (or install new)

Paint cabinet boxes (in-place spray with masking, or roll-and-brush if tenting is impractical)


Closeout

Final walkthrough

Touch-up kit (small bottle of color) left with {{client_name}}

02Schedule

reqai rewritable

Estimated duration: 5–8 working days including cure time.


**Day 1:** Remove doors, prep, first primer coat

**Day 2:** Second primer coat, sand

**Day 3:** First finish coat (doors and boxes)

**Day 4:** Second finish coat

**Days 5–7:** Cure time (doors cannot be reinstalled until enamel is hard — typically 48–72 hours)

**Day 8:** Reinstall, adjust, walkthrough


Start date: {{start_date}}. Kitchen is partially out-of-service for 5–8 days.

03Investment

req

Total contract price: {{total}}


**Deposit: {{deposit}}** — signing

**Balance: remainder** — at completion and walkthrough

04Payment Terms

req

Balance due at completion.


Invoices are due upon receipt. Payments more than ten (10) calendar days past due accrue a service charge of one and one-half percent (1.5%) per month on the unpaid balance, or the maximum rate permitted by law, whichever is less. {{contractor_name}} reserves the right to stop work and preserve lien rights if any progress payment is not received within five (5) business days of the due date. All retained mechanic's lien, stop notice, and bond rights under applicable state law are preserved.

05Exclusions

reqai rewritable

The following items are specifically NOT included in the contract price and are the responsibility of {{client_name}} unless added by written Change Order:


Permits, plan-review fees, and jurisdictional inspection fees unless explicitly itemized above

Repair or remediation of pre-existing code violations discovered during the work

Asbestos, lead paint, mold, or other hazardous material abatement

Structural engineering, architectural drawings, or third-party design services

Finish selections, fixtures, or appliances not listed in the itemized scope

Work on concealed systems (electrical, plumbing, HVAC, framing) beyond the points of connection identified

Landscaping restoration beyond returning disturbed areas to rough grade

Post-completion cleaning beyond construction broom-clean

Cabinet door replacement (this template refinishes existing doors; replacement doors priced separately)

Cabinet box replacement or re-facing

New hardware (hinges, pulls, knobs) beyond reinstalling existing

Countertop work

Glass inserts in cabinet doors

Painting over thermofoil or plastic laminate (requires specialized prep; may not be warrantied)

Decorative wrapping or glazing

06Assumptions

reqai rewritable

This proposal is based on the following assumptions. If any assumption is incorrect, the contract price and schedule are subject to adjustment by Change Order:


Site access is available during normal working hours (7am–5pm, Monday–Saturday)

Adequate parking is available within 100 feet of the work area

Electrical power and potable water are available on-site at no cost to contractor

Existing structural elements, waste lines, water supply, and electrical service are in serviceable condition unless noted

{{client_name}} will remove personal property, artwork, and valuables from the work area prior to start

Work is based on a single mobilization; re-mobilization required due to delays outside contractor's control will be billed at current rates

Cabinet doors and boxes are solid wood or wood-veneer (thermofoil or plastic laminate requires Change Order)

Kitchen can be substantially out-of-service for 5–8 working days (doors off, cabinet contents removed)

{{client_name}} removes all contents from cabinets before start date

Home has adequate ventilation for light spray work if done on-site

07Change Order Process

req

Any modification to the scope, specifications, materials, or schedule set forth in this agreement must be authorized in writing as a Change Order signed by both parties before the work is performed. Each Change Order will describe the modified scope, any adjustment to the contract price, and any impact on the schedule. Verbal instructions do not modify this agreement. Additional time and cost associated with unforeseen conditions — including but not limited to concealed rot, asbestos, mold, faulty prior installation, unmarked utilities, or code-required upgrades triggered by the work — will be documented as a Change Order and billed at the rates stated in this proposal or at {{contractor_name}}'s then-current published labor rates, whichever is in effect at the time the condition is discovered.

08Warranty

reqai rewritable

{{contractor_name}} warrants the workmanship of the installed work for a period of one (1) year from the date of substantial completion. Manufacturer warranties on materials and equipment pass through to {{client_name}} as provided by the manufacturer and are the exclusive source of any material warranty. This warranty does not cover normal wear, abuse, neglect, acts of God, subsequent work performed by others, damage from settlement or movement of the building, or modifications to the installed work performed without written consent. To make a warranty claim, {{client_name}} must notify {{contractor_name}} in writing within thirty (30) days of discovering the alleged defect and allow reasonable access to inspect and repair.

09Validity & Acceptance

req

This proposal is valid for 30 days from the proposal date ({{proposal_date}}). Pricing is subject to change after that date due to material market fluctuations and scheduling availability. Acceptance requires signature below and receipt of the deposit amount stated in Payment Terms. Upon acceptance, this proposal, together with any attached specifications and subsequent written Change Orders, constitutes the complete agreement between the parties and supersedes any prior oral or written discussions.

10Signatures

req

**{{contractor_name}}** — License {{contractor_license}}


By: ________________________ Date: ______________


Print Name: ________________________



**{{client_name}}** — Owner / Authorized Representative


By: ________________________ Date: ______________


Print Name: ________________________


Property Address: {{client_address}}

Default payment terms

50% deposit due at signing, 40% on rough-in / mid-project milestone, 10% on substantial completion

Legal notes

  • · Refinished cabinets cure to full hardness over 14–21 days; avoid heavy cleaning or scrubbing during the cure period.
  • · Workmanship warranty: 2 years against peeling, chipping, or excessive wear under normal use. Does not cover abrasion from pot handles, chair backs, or pet scratching.

Ready to send this one?

Use this template kicks you into the ProJobCalc proposal builder with the scope, exclusions, payment terms, and variables pre-loaded.

Use this template