AC Condenser & Air Handler Replacement

Split-system AC replacement with matched condenser, coil, and air handler

Replacement of a residential split-system air conditioner. Covers new condenser, matching evaporator coil (or air handler), refrigerant line flush, thermostat, startup, and commissioning. Priced for 2–5 ton systems in the $6,500–$14,500 range.

Sections

10

Variables

14

Word count

~1400

Validity

30 days

Variables you'll fill in

{{client_name}}

Client namereq

e.g. Jane Homeowner

{{client_address}}

Project addressreq

e.g. 1234 Main St, Phoenix AZ 85001

{{contractor_name}}

Your company namereq

e.g. Acme Construction LLC

{{contractor_license}}

License numberreq

e.g. ROC 123456

{{scope_summary}}

One-paragraph scope summaryreq

e.g. Describe what this project covers in 2-3 sentences.

{{total}}

Total contract pricereq

e.g. 24500

{{deposit}}

Deposit / down paymentreq

e.g. 5000

{{start_date}}

Estimated start datereq

e.g. 2026-05-01

{{completion_date}}

Estimated substantial completionreq

e.g. 2026-06-15

{{proposal_date}}

Date of proposalreq

e.g. 2026-04-18

{{system_tonnage}}

System tonnagereq

e.g. 3 ton

{{seer_rating}}

SEER2 ratingreq

e.g. 15.2 SEER2

{{equipment_brand}}

Equipment make & modelreq

e.g. Trane XR14 + TEM6 air handler

{{refrigerant_type}}

Refrigerantreq

e.g. R-410A / R-32 / R-454B

Section-by-section preview

01Scope of Work

reqai rewritable

This proposal covers replacement of the existing split-system air conditioner at {{client_address}} with a new {{system_tonnage}} {{seer_rating}} {{equipment_brand}} system using {{refrigerant_type}} refrigerant.


Removal & recovery

EPA-certified refrigerant recovery from existing system (logged per EPA §608)

Disconnect and remove existing condenser, evaporator coil, and refrigerant lines if non-reusable

Haul-off and recycle old equipment


Install

Set new condenser on new composite or rubber isolation pad, level

Install new matched evaporator coil (or air handler) per manufacturer spec

Flush or replace refrigerant line set if incompatible with new refrigerant type

Install new filter drier and factory-supplied line set fittings

New thermostat wire (if needed) and disconnect whip at condenser

Condensate drain with float switch and proper slope

Electrical disconnect, whip, and breaker at panel (upsize if required; panel work itemized below)


Commissioning

Pressure test and evacuate to 500 microns per manufacturer spec

Charge per manufacturer weigh-in; verify subcooling/superheat per nameplate

Start up, verify static pressure, supply/return temperature split, and thermostat operation

Submit manufacturer registration for extended parts warranty


**Included thermostat:** programmable or smart thermostat per {{client_name}}'s selection; premium thermostats (Ecobee SmartSensor, Nest Learning) priced as upgrade line item.

02Schedule

reqai rewritable

Estimated duration: 1 working day for most swaps; 2 days if line set replacement or electrical panel work is required.


**Morning:** Recovery, removal, electrical disconnect

**Midday:** Set new condenser and coil, connect line set

**Afternoon:** Pressure test, evacuate, charge, commission


Start date: {{start_date}}. Home may be without cooling for part of the day during equipment swap; fans and windows recommended in summer.

03Investment

req

Total contract price: {{total}}


Fixed-price payment schedule:


**Deposit: {{deposit}}** — at signing (reserves start date, covers equipment order)

**Balance: remainder** — due same-day upon commissioning and walk-through


**Financing available** through {{contractor_name}}'s third-party finance partner (separate application).

04Payment Terms

req

Balance due same-day upon commissioning. Credit card payments accepted (3% surcharge applies). Financing available through pre-approved third-party lender.


Invoices are due upon receipt. Payments more than ten (10) calendar days past due accrue a service charge of one and one-half percent (1.5%) per month on the unpaid balance, or the maximum rate permitted by law, whichever is less. {{contractor_name}} reserves the right to stop work and preserve lien rights if any progress payment is not received within five (5) business days of the due date. All retained mechanic's lien, stop notice, and bond rights under applicable state law are preserved.

05Exclusions

reqai rewritable

The following items are specifically NOT included in the contract price and are the responsibility of {{client_name}} unless added by written Change Order:


Permits, plan-review fees, and jurisdictional inspection fees unless explicitly itemized above

Repair or remediation of pre-existing code violations discovered during the work

Asbestos, lead paint, mold, or other hazardous material abatement

Structural engineering, architectural drawings, or third-party design services

Finish selections, fixtures, or appliances not listed in the itemized scope

Work on concealed systems (electrical, plumbing, HVAC, framing) beyond the points of connection identified

Landscaping restoration beyond returning disturbed areas to rough grade

Post-completion cleaning beyond construction broom-clean

Duct repair, replacement, or modification (priced separately; see duct-replacement template)

Electrical service upgrade or sub-panel work

Gas-line work (for heat pump + gas furnace dual-fuel conversions, priced separately)

Rebate paperwork processing beyond one utility rebate (additional paperwork billable hourly)

Zoning dampers, bypass dampers, or variable-speed airflow upgrades

Relocation of condenser from existing pad to new location

Indoor air quality add-ons (UV lamp, media filter upgrade, dehumidifier) unless itemized

06Assumptions

reqai rewritable

This proposal is based on the following assumptions. If any assumption is incorrect, the contract price and schedule are subject to adjustment by Change Order:


Site access is available during normal working hours (7am–5pm, Monday–Saturday)

Adequate parking is available within 100 feet of the work area

Electrical power and potable water are available on-site at no cost to contractor

Existing structural elements, waste lines, water supply, and electrical service are in serviceable condition unless noted

{{client_name}} will remove personal property, artwork, and valuables from the work area prior to start

Work is based on a single mobilization; re-mobilization required due to delays outside contractor's control will be billed at current rates

Existing refrigerant line set is sized for new equipment and free of restrictions or leaks

Existing electrical disconnect and breaker are sized correctly for new unit; upgrade priced separately if needed

Existing condensate drain is clear and properly routed

{{client_name}} understands the replacement is like-for-like tonnage unless a Manual J load calculation was performed

07Change Order Process

req

Any modification to the scope, specifications, materials, or schedule set forth in this agreement must be authorized in writing as a Change Order signed by both parties before the work is performed. Each Change Order will describe the modified scope, any adjustment to the contract price, and any impact on the schedule. Verbal instructions do not modify this agreement. Additional time and cost associated with unforeseen conditions — including but not limited to concealed rot, asbestos, mold, faulty prior installation, unmarked utilities, or code-required upgrades triggered by the work — will be documented as a Change Order and billed at the rates stated in this proposal or at {{contractor_name}}'s then-current published labor rates, whichever is in effect at the time the condition is discovered.

08Warranty

reqai rewritable

{{contractor_name}} warrants the workmanship of the installed work for a period of one (1) year from the date of substantial completion. Manufacturer warranties on materials and equipment pass through to {{client_name}} as provided by the manufacturer and are the exclusive source of any material warranty. This warranty does not cover normal wear, abuse, neglect, acts of God, subsequent work performed by others, damage from settlement or movement of the building, or modifications to the installed work performed without written consent. To make a warranty claim, {{client_name}} must notify {{contractor_name}} in writing within thirty (30) days of discovering the alleged defect and allow reasonable access to inspect and repair.

09Validity & Acceptance

req

This proposal is valid for 30 days from the proposal date ({{proposal_date}}). Pricing is subject to change after that date due to material market fluctuations and scheduling availability. Acceptance requires signature below and receipt of the deposit amount stated in Payment Terms. Upon acceptance, this proposal, together with any attached specifications and subsequent written Change Orders, constitutes the complete agreement between the parties and supersedes any prior oral or written discussions.

10Signatures

req

**{{contractor_name}}** — License {{contractor_license}}


By: ________________________ Date: ______________


Print Name: ________________________



**{{client_name}}** — Owner / Authorized Representative


By: ________________________ Date: ______________


Print Name: ________________________


Property Address: {{client_address}}

Default payment terms

50% deposit due at signing, 40% on rough-in / mid-project milestone, 10% on substantial completion

Legal notes

  • · Equipment carries manufacturer limited parts warranty (typically 10 years registered, 5 years unregistered); {{contractor_name}} registers warranty with the manufacturer at project completion.
  • · Labor warranty is 1 year per the Warranty section below.
  • · EPA §608 certification number available on request.