Gutter Installation / Replacement

Seamless aluminum gutters with downspouts and gutter guards

Removal of existing gutters (where present), installation of new seamless 5" or 6" aluminum K-style gutters with hidden hangers, downspouts to grade, and optional gutter guards. Priced per linear foot in the $9–$18/ft range plus downspouts and accessories.

Sections

10

Variables

15

Word count

~750

Validity

30 days

Variables you'll fill in

{{client_name}}

Client namereq

e.g. Jane Homeowner

{{client_address}}

Project addressreq

e.g. 1234 Main St, Phoenix AZ 85001

{{contractor_name}}

Your company namereq

e.g. Acme Construction LLC

{{contractor_license}}

License numberreq

e.g. ROC 123456

{{scope_summary}}

One-paragraph scope summaryreq

e.g. Describe what this project covers in 2-3 sentences.

{{total}}

Total contract pricereq

e.g. 24500

{{deposit}}

Deposit / down paymentreq

e.g. 5000

{{start_date}}

Estimated start datereq

e.g. 2026-05-01

{{completion_date}}

Estimated substantial completionreq

e.g. 2026-06-15

{{proposal_date}}

Date of proposalreq

e.g. 2026-04-18

{{linear_feet}}

Linear feet of gutterreq

e.g. 160

{{gutter_size}}

Gutter profilereq

e.g. 6" K-style aluminum, .032 gauge

{{downspout_count}}

Number of downspoutsreq

e.g. 6

{{color}}

Gutter colorreq

e.g. Royal Brown

{{include_guards}}

Gutter guards?

e.g. Yes — Leaf Relief or equivalent

Section-by-section preview

01Scope of Work

reqai rewritable

This proposal covers installation of approximately {{linear_feet}} linear feet of new seamless gutter at {{client_address}}.


Scope of work

Remove existing gutters and downspouts where present; haul off-site

Inspect fascia for rot or damage; minor patches included (major fascia replacement quoted separately)

Run new {{gutter_size}} seamless gutter on-site (color: {{color}})

Install hidden hangers at 24" on-center for proper load capacity

Install {{downspout_count}} downspouts with proper pitch and elbows to discharge 4'+ from foundation

Install splash blocks at downspout outlets

Caulk and seal all joints with manufacturer-approved sealant

{{include_guards}}

Final cleanup of yard around work zone


What's included

Seamless gutter run on-site (no factory joints except at corners)

Hidden hangers (no external straps)

Downspouts and elbows

Splash blocks

Permit if required by AHJ

Cleanup

02Schedule

reqai rewritable

Estimated duration: 1 day on-site for installations under 200 lin ft.


Start date: on or about {{start_date}}. Weather-dependent — installation deferred during heavy rain or temperatures below 35°F (sealant cure issue).

03Investment

req

Total contract price: {{total}}


Fixed price based on linear footage, downspout count, and color selection at signing.


Payment in full upon substantial completion (gutters installed and tested with hose).

04Payment Terms

req

Payment in full on substantial completion. Check, ACH, or major credit card accepted (3% processing surcharge for credit).


Invoices are due upon receipt. Payments more than ten (10) calendar days past due accrue a service charge of one and one-half percent (1.5%) per month on the unpaid balance, or the maximum rate permitted by law, whichever is less. {{contractor_name}} reserves the right to stop work and preserve lien rights if any progress payment is not received within five (5) business days of the due date. All retained mechanic's lien, stop notice, and bond rights under applicable state law are preserved.

05Exclusions

reqai rewritable

The following items are specifically NOT included in the contract price and are the responsibility of {{client_name}} unless added by written Change Order:


Permits, plan-review fees, and jurisdictional inspection fees unless explicitly itemized above

Repair or remediation of pre-existing code violations discovered during the work

Asbestos, lead paint, mold, or other hazardous material abatement

Structural engineering, architectural drawings, or third-party design services

Finish selections, fixtures, or appliances not listed in the itemized scope

Work on concealed systems (electrical, plumbing, HVAC, framing) beyond the points of connection identified

Landscaping restoration beyond returning disturbed areas to rough grade

Post-completion cleaning beyond construction broom-clean

Fascia board replacement beyond minor patching (quoted separately at $8–$14/lin ft)

Soffit repair or replacement

Roof flashing or drip edge repairs

Underground drain tile or French drain (separate quote)

Pop-up emitters or decorative downspout extensions

Removal of trees or branches obstructing gutter line (owner responsibility)

06Assumptions

reqai rewritable

This proposal is based on the following assumptions. If any assumption is incorrect, the contract price and schedule are subject to adjustment by Change Order:


Site access is available during normal working hours (7am–5pm, Monday–Saturday)

Adequate parking is available within 100 feet of the work area

Electrical power and potable water are available on-site at no cost to contractor

Existing structural elements, waste lines, water supply, and electrical service are in serviceable condition unless noted

{{client_name}} will remove personal property, artwork, and valuables from the work area prior to start

Work is based on a single mobilization; re-mobilization required due to delays outside contractor's control will be billed at current rates

Fascia is structurally sound; minor cosmetic damage may be patched but full replacement is excluded

Roof edge is straight and accessible; cathedral ceilings or unusual roof lines may require T&M for additional time

Existing electrical and plumbing don't conflict with downspout drop locations

07Change Order Process

req

Any modification to the scope, specifications, materials, or schedule set forth in this agreement must be authorized in writing as a Change Order signed by both parties before the work is performed. Each Change Order will describe the modified scope, any adjustment to the contract price, and any impact on the schedule. Verbal instructions do not modify this agreement. Additional time and cost associated with unforeseen conditions — including but not limited to concealed rot, asbestos, mold, faulty prior installation, unmarked utilities, or code-required upgrades triggered by the work — will be documented as a Change Order and billed at the rates stated in this proposal or at {{contractor_name}}'s then-current published labor rates, whichever is in effect at the time the condition is discovered.

08Warranty

reqai rewritable

{{contractor_name}} warrants the workmanship of the installed work for a period of one (1) year from the date of substantial completion. Manufacturer warranties on materials and equipment pass through to {{client_name}} as provided by the manufacturer and are the exclusive source of any material warranty. This warranty does not cover normal wear, abuse, neglect, acts of God, subsequent work performed by others, damage from settlement or movement of the building, or modifications to the installed work performed without written consent. To make a warranty claim, {{client_name}} must notify {{contractor_name}} in writing within thirty (30) days of discovering the alleged defect and allow reasonable access to inspect and repair.

09Validity & Acceptance

req

This proposal is valid for 30 days from the proposal date ({{proposal_date}}). Pricing is subject to change after that date due to material market fluctuations and scheduling availability. Acceptance requires signature below and receipt of the deposit amount stated in Payment Terms. Upon acceptance, this proposal, together with any attached specifications and subsequent written Change Orders, constitutes the complete agreement between the parties and supersedes any prior oral or written discussions.

10Signatures

req

**{{contractor_name}}** — License {{contractor_license}}


By: ________________________ Date: ______________


Print Name: ________________________



**{{client_name}}** — Owner / Authorized Representative


By: ________________________ Date: ______________


Print Name: ________________________


Property Address: {{client_address}}

Default payment terms

50% deposit due at signing, 40% on rough-in / mid-project milestone, 10% on substantial completion

Legal notes

  • · 1-year workmanship warranty on installation; aluminum gutter material warranty pass-through (typically 20+ years).
  • · Gutter guard manufacturer warranty (where included) registered to homeowner at closeout.