Garage Door & Opener Replacement

Remove old garage door and install new insulated steel door with smart opener

Full garage door replacement — remove and dispose of old door and opener, install new insulated steel sectional door with new tracks and torsion springs, install new smart opener with battery backup, balance and test. Priced for standard 16'×7' double doors in the $2,200–$4,800 range.

Sections

10

Variables

14

Word count

~850

Validity

30 days

Variables you'll fill in

{{client_name}}

Client namereq

e.g. Jane Homeowner

{{client_address}}

Project addressreq

e.g. 1234 Main St, Phoenix AZ 85001

{{contractor_name}}

Your company namereq

e.g. Acme Construction LLC

{{contractor_license}}

License numberreq

e.g. ROC 123456

{{scope_summary}}

One-paragraph scope summaryreq

e.g. Describe what this project covers in 2-3 sentences.

{{total}}

Total contract pricereq

e.g. 24500

{{deposit}}

Deposit / down paymentreq

e.g. 5000

{{start_date}}

Estimated start datereq

e.g. 2026-05-01

{{completion_date}}

Estimated substantial completionreq

e.g. 2026-06-15

{{proposal_date}}

Date of proposalreq

e.g. 2026-04-18

{{door_size}}

Door sizereq

e.g. 16' wide × 7' tall (double-car)

{{door_brand}}

Door brand / modelreq

e.g. Clopay Premium Series, insulated, long panel, white

{{opener_brand}}

Opener brand / modelreq

e.g. LiftMaster 8500W wall-mount with battery backup

{{windows}}

Windows in door?

e.g. Top row of 4 windows, frosted glass

Section-by-section preview

01Scope of Work

reqai rewritable

This proposal covers replacement of the {{door_size}} garage door at {{client_address}}.


Scope of work

Disconnect existing opener; remove old garage door, tracks, and hardware; haul off-site for proper recycling

Inspect framing and header for rot or structural damage; minor reinforcement included (major repair quoted separately)

Install new {{door_brand}} sectional door with insulated panels (R-value typically 9–18 depending on panel)

Install new tracks, hinges, rollers, and bottom seal

Install new high-cycle torsion springs sized for the door weight (10,000+ cycle springs included)

{{windows}}

Install new {{opener_brand}} with safety eyes and emergency release

Program 2 remotes and HomeLink/MyQ smart home connection per manufacturer instructions

Balance door, test safety reverse, and verify smooth operation

Provide owner with operation manual, warranty registration, and tutorial


What's included

New door with manufacturer warranty (lifetime on panels, 5–10 years on hardware/springs depending on brand)

New opener with manufacturer warranty (typically motor lifetime, parts 5 years)

All hardware: tracks, hinges, rollers, springs, cables, brackets

2 remotes + outdoor keypad (where supported by opener model)

Old door and opener removal and recycling

1-year workmanship warranty

02Schedule

reqai rewritable

Estimated duration: 4–6 hours same-day install. Garage operational immediately upon completion.


Start date: on or about {{start_date}}, typically 5–14 days from order (door panel lead time varies by manufacturer and color).

03Investment

req

Total contract price: {{total}}


Payment schedule:

**40% deposit** at signing — authorizes door and opener order

**Balance** on substantial completion (door installed, opener programmed, owner walkthrough complete)


A standard manufacturer warranty is registered to the homeowner; documentation provided at closeout.

04Payment Terms

req

40% deposit at signing to authorize order; balance on substantial completion. Payment due within 3 business days of completion.


Invoices are due upon receipt. Payments more than ten (10) calendar days past due accrue a service charge of one and one-half percent (1.5%) per month on the unpaid balance, or the maximum rate permitted by law, whichever is less. {{contractor_name}} reserves the right to stop work and preserve lien rights if any progress payment is not received within five (5) business days of the due date. All retained mechanic's lien, stop notice, and bond rights under applicable state law are preserved.

05Exclusions

reqai rewritable

The following items are specifically NOT included in the contract price and are the responsibility of {{client_name}} unless added by written Change Order:


Permits, plan-review fees, and jurisdictional inspection fees unless explicitly itemized above

Repair or remediation of pre-existing code violations discovered during the work

Asbestos, lead paint, mold, or other hazardous material abatement

Structural engineering, architectural drawings, or third-party design services

Finish selections, fixtures, or appliances not listed in the itemized scope

Work on concealed systems (electrical, plumbing, HVAC, framing) beyond the points of connection identified

Landscaping restoration beyond returning disturbed areas to rough grade

Post-completion cleaning beyond construction broom-clean

Header or framing reinforcement beyond minor repair (quoted separately if structural rot found)

Drywall repair around opening (paint/texture by owner)

Electrical outlet for new opener if not currently present (typical add: $180–$340)

Door painting beyond factory finish (typical add: $300–$700 for custom paint)

Insulation upgrade or weather sealing of garage walls

Smart home hub or Wi-Fi extender if signal is weak in garage

06Assumptions

reqai rewritable

This proposal is based on the following assumptions. If any assumption is incorrect, the contract price and schedule are subject to adjustment by Change Order:


Site access is available during normal working hours (7am–5pm, Monday–Saturday)

Adequate parking is available within 100 feet of the work area

Electrical power and potable water are available on-site at no cost to contractor

Existing structural elements, waste lines, water supply, and electrical service are in serviceable condition unless noted

{{client_name}} will remove personal property, artwork, and valuables from the work area prior to start

Work is based on a single mobilization; re-mobilization required due to delays outside contractor's control will be billed at current rates

Existing opening is square and within standard tolerances for the chosen door size

Header and framing are structurally sound for new door weight

Existing 110V electrical outlet is available within 6 ft of opener mount location

Wi-Fi signal reaches the garage for smart opener features (where applicable)

07Change Order Process

req

Any modification to the scope, specifications, materials, or schedule set forth in this agreement must be authorized in writing as a Change Order signed by both parties before the work is performed. Each Change Order will describe the modified scope, any adjustment to the contract price, and any impact on the schedule. Verbal instructions do not modify this agreement. Additional time and cost associated with unforeseen conditions — including but not limited to concealed rot, asbestos, mold, faulty prior installation, unmarked utilities, or code-required upgrades triggered by the work — will be documented as a Change Order and billed at the rates stated in this proposal or at {{contractor_name}}'s then-current published labor rates, whichever is in effect at the time the condition is discovered.

08Warranty

reqai rewritable

{{contractor_name}} warrants the workmanship of the installed work for a period of one (1) year from the date of substantial completion. Manufacturer warranties on materials and equipment pass through to {{client_name}} as provided by the manufacturer and are the exclusive source of any material warranty. This warranty does not cover normal wear, abuse, neglect, acts of God, subsequent work performed by others, damage from settlement or movement of the building, or modifications to the installed work performed without written consent. To make a warranty claim, {{client_name}} must notify {{contractor_name}} in writing within thirty (30) days of discovering the alleged defect and allow reasonable access to inspect and repair.

09Validity & Acceptance

req

This proposal is valid for 30 days from the proposal date ({{proposal_date}}). Pricing is subject to change after that date due to material market fluctuations and scheduling availability. Acceptance requires signature below and receipt of the deposit amount stated in Payment Terms. Upon acceptance, this proposal, together with any attached specifications and subsequent written Change Orders, constitutes the complete agreement between the parties and supersedes any prior oral or written discussions.

10Signatures

req

**{{contractor_name}}** — License {{contractor_license}}


By: ________________________ Date: ______________


Print Name: ________________________



**{{client_name}}** — Owner / Authorized Representative


By: ________________________ Date: ______________


Print Name: ________________________


Property Address: {{client_address}}

Default payment terms

50% deposit due at signing, 40% on rough-in / mid-project milestone, 10% on substantial completion

Legal notes

  • · Door and opener manufacturer warranties registered to homeowner; honored at any authorized service provider.
  • · Torsion springs are stored under high tension — DIY adjustment is dangerous; warranty void if springs are tampered with by non-certified installer.