01Scope of Work
This proposal covers conversion of the existing tub alcove ({{alcove_width}}" wide) at {{client_address}} to a walk-in tile shower.
Scope
• Remove existing tub, surround tile or acrylic, and associated plumbing
• Install cement board on all walls from pan to full height; apply waterproof membrane to floor pan and lower walls
• Flood test prior to tile installation
• Install linear or center drain per plan
• Install {{tile_selections}}
• Grout and seal all joints; silicone at all inside corners per TCNA standards
• Install shower niche (one standard niche included)
• Install {{shower_valve}} with integral diverter if specified
• Template, fabricate, and install {{glass_type}}
• Reconnect supply and drain; test for leaks
Note: Toilet, vanity, and floor tile outside the shower footprint are not included in this scope.